Start with the question, not the technology
Most O&M teams do not need "AI". They need fewer lost kilowatt-hours, faster answers when an owner asks why output was low, and less time spent on reports. Some of that is best done with plain physics and arithmetic. Some of it is genuinely better with machine learning or a language model. The skill is knowing which is which.
A useful test: if an engineer could write down the rule, write down the rule. Expected generation from measured sunlight is a formula. A grid outage is an event with a start and an end. Neither needs a neural network. Where the rule is hard to write, because the pattern is subtle or the inputs are many, a learned model starts to earn its place.
What works today
1. Anomaly detection against peers
Inverters at the same plant see the same sky. If twenty inverters of the same model produce about 0.8 kW per kWp at noon and one produces 0.7, something is wrong with that one: a failed string, a blown fuse, a tracker stuck at an angle, shading from new growth. Comparing each unit with its healthy peers, moment by moment, finds these faults without needing a perfect model of the plant.
This works well because the peers cancel out the weather. It does not need years of history. It does need correct mapping of which strings feed which inverter, and the DC capacity of each, or the comparison is unfair from the start. Learned models add value on top by handling peers that are not quite identical: different orientation, different module batches, partial shading in the morning.
2. Short-term generation forecasting
Forecasting the next day's output, or the next few hours', is a mature field. Numerical weather prediction gives irradiance and temperature forecasts. A model trained on the plant's own history learns how that plant turns forecast weather into energy, including its losses, clipping and shading. For the next hour or two, satellite cloud images help more than weather models do.
Forecast quality is measured, not claimed. Compare every forecast with what actually happened, with standard error measures, and against a simple baseline such as "tomorrow will be like today". A model that cannot beat that baseline is not worth running. We cover this in solar generation forecasting: the basics.
3. Assistants that answer from your own records
Large language models are good at reading and writing. They are not good at knowing facts about your plant. Put the two together the right way and you get something useful: an assistant that answers "why was Plant X down yesterday?" by looking up the day's loss breakdown, the events logged, the tickets raised and the technician's closing notes, and then writes a short answer with links to each source.
The important parts are the lookup and the sources. The model should only answer from records it fetched, and show them. If the records do not explain the loss, it should say so. An assistant that makes up a plausible reason is worse than no assistant, because people will believe it.
Assistants also help with the writing work that eats engineers' time: drafting the commentary on a monthly report from the figures, summarising a week of tickets for a review meeting, or turning a technician's voice note into a tidy closing remark. A person reviews before anything goes out.
4. Cleaning schedules weighed against cost
Soiling loss can be measured from the plant's own performance ratio: it drifts down slowly between cleanings and jumps back after one. Once you know how fast a plant soils in each season, deciding when to clean becomes an optimisation problem. Each cleaning costs water, labour and sometimes downtime. Each day of dirty modules costs energy at the tariff. A rule that spots real soiling and suggests a cleaning for one plant needs no AI; HKDataCrest Solar already does that. Where a model earns its place is across a fleet: learning each plant's soiling rate by season, forecasting rain, and planning crews and water so the total cost is lowest. Our guide on soiling loss and when to clean explains the measurement side.
What needs clean data first
These uses are real, but they come later, once the data underneath can be trusted.
Predictive maintenance
Predicting an inverter failure weeks ahead needs a history of failures, matched to the readings that came before them. Most portfolios have the readings but not the failure history in usable form: tickets say "inverter fault, reset" with no fault code, no part replaced and no clear time. Until tickets are structured, a failure model has nothing to learn from. Read predictive maintenance for solar inverters for what to collect first.
Root-cause classification
A model that labels each loss automatically ("this was soiling, that was a string fault") needs examples of losses whose causes are known. If your past losses sit in one bucket called "other", there is nothing to train on. Getting the causes right with rules and engineers' judgement for a season is the training data.
Portfolio benchmarking
Ranking plants against each other only works when the figures are computed the same way at every plant. Different SCADA systems, different irradiance sensors and different definitions of availability make naive comparisons misleading. Normalise first.
What is mostly hype
- "AI-powered" dashboards that show the same charts as before with a new label.
- Accuracy claims with no baseline. "95% accurate" means nothing without saying accurate at what, over which period, against what simple alternative.
- Fully autonomous O&M. Models can rank and suggest. Isolating equipment, issuing permits and climbing on structures remain human work, and should.
- Models that fill data gaps silently. A gap filled with a guess looks like real data. If a model fills a gap, the report must say so.
- Chatbots without sources. If it cannot show where an answer came from, do not use it for anything an owner will read.
The data checklist before any AI project
Run through this before spending money on a model. If most answers are no, fix the data first. It pays back on its own, in better reports and fewer arguments.
- Do you have 5- or 15-minute readings for each inverter and the export meter, for at least one full year?
- Are gaps in the data marked as gaps, not zeros?
- Is the irradiance sensor checked for drift and soiling?
- Is each day's shortfall split into causes, with grid and curtailment separate from plant faults?
- Are tickets structured: equipment, fault code, start, end, action taken, parts used?
- Are cleanings logged with dates, per block?
- Is the string-to-inverter mapping and DC capacity per inverter correct?
How to run a first AI project
Pick one question with a clear owner and a measurable answer. "Find underperforming strings across our five largest plants every week" is a good first project. "Use AI to optimise O&M" is not. Agree how you will judge it before you start: faults found that the team confirmed on site, energy recovered after fixing them, hours saved on a report. Run it alongside the current process for a few weeks, then decide.
Where HKDataCrest fits
HKDataCrest Solar itself uses explainable analytics, not AI: expected generation from measured sunlight, every shortfall split into causes, soiling found from the performance ratio trend, and a check for drifting irradiance sensors. That gives you the clean, explained data that AI needs. On top of it, HKDataCrest builds AI as a project for your portfolio: plant assistants, anomaly detection, forecasting, fleet cleaning plans and predictive maintenance. See AI for solar and performance analytics.