Performance and loss analysis
Generation against expected, and the reason for every shortfall.
HKDataCrest Solar compares what each plant made with what the sunlight should have given, every 5 minutes. The gap is split into grid outage, grid limit (curtailment), inverter down, weak strings, dirty panels and unexplained, and the parts add up to the whole loss. Performance ratio, PR without grid limits, and plant and grid availability come from the same figures.
The problem
Everyone can see the shortfall. Few can say where it went.
A plant made less than budget last month. Was it the weather, the grid, a tripped inverter, dust, or something nobody has found yet? Without a sound expected model and a fixed way of sharing out the loss, every answer is an argument, and the contractor and the owner each have their own spreadsheet.
What it does
Explainable analytics, from reading to report.
-
An expected model you can check
Expected energy is the sunlight measured on the module plane, times DC capacity, times the plant's design PR, over the intervals actually received.
-
Every loss in one bucket
Each interval's gap goes to exactly one cause, in a fixed order, so the causes add up to the loss with nothing counted twice.
-
Soiling from your own data
Dirty panels are found from the slow slide in daily PR between cleanings, with a cleaning suggested when the loss is real.
-
Contract figures
Contract PR leaves out grid outages and curtailment. PR guarantee damages, availability shortfall and cleaning cycles are worked out per contract.
The arithmetic
Three formulas and one rule.
Expected energy = irradiation on the module plane (kWh/m²) × DC capacity (kWp) × design PR. It answers one question: given today's sun, is the plant producing what it should?
Performance ratio = energy exported ÷ (irradiation on the module plane × DC capacity). This is the basic PR of IEC 61724, with the 1 kW/m² reference irradiance folded in. PR without grid limits drops the curtailed intervals from both sides, so the plant is not blamed for an instruction it had to follow.
The rule: in each 5-minute interval, the gap to expected goes to the first cause that applies, in this order: grid outage, grid limit, inverter down, weak strings, dirty panels, unexplained. Weak strings are measured against healthy peer inverters at the same moment. Whatever is left is shown as unexplained, in the open.
How it works
How a day's loss gets explained.
Read the sunlight
Irradiance on the module plane, from the plant's sensor. A sensor that starts to drift is flagged and its readings are not used silently.
Work out expected
Interval by interval, only over the time data actually arrived. A comms gap never lowers PR.
Share out the gap
Each interval's loss goes to one cause, using events logged at the plant and the inverter readings.
Roll it up
Days build into months and contracts, with the events behind each kWh one click away.
Questions
Performance questions.
How is expected generation calculated?
From the irradiation measured on the module plane in each interval, times the plant's DC capacity, times its design performance ratio, over the intervals for which data arrived.
What is the difference between expected and budget?
Budget is the energy planned for the period, usually from the plant's P50 estimate. Expected uses the sunlight that actually fell. The gap between the two is the weather. The gap between expected and actual is the plant.
Why put losses in a fixed order?
So no kWh is counted twice. If the grid was down, the inverters being off at the same time is not a separate loss. The order makes the causes add up to the total gap.
Is the PR temperature-corrected?
The PR in reports is the standard, uncorrected PR. The soiling check uses a temperature-weighted PR internally so that hot and cool days compare fairly.
What does unexplained mean?
The part of the gap no recorded cause accounts for. It is shown openly rather than spread across other causes, so it can be investigated.
Keep going
Related.
Start with whatever is easiest
Tell us what's slowing your business down.
Three easy ways in. All free, all answered by the people who would do the work.
Book a 30-minute call
Talk it through with us. You leave knowing whether a pilot makes sense and what it would cover.
Get a free data check
Send us one export, such as sales, stock or orders. Within 2 working days we send back 3 things we'd fix.
How it worksSend a short note
Three quick questions: what you do, what's not working, and how to reach you.
Write to us