Why plants forecast at all
A solar plant cannot choose how much it produces. The sky decides. But the grid has to balance supply and demand every few minutes, so grid operators want to know in advance what each large generator will inject. In India, regulators have set forecasting and scheduling rules for wind and solar generators connected at certain levels, with deviation charges when actual output strays too far from the schedule. The exact rules depend on the regulator and the connection, so check the regulation that applies to your plant.
Even where no rule applies, forecasts help O&M. They tell you which days are good for planned shutdowns, help plan cleaning around expected rain, and give a commercial team a view of next week's revenue.
Forecast horizons
Different horizons use different inputs. Mixing them up is a common source of disappointment.
| Horizon | Typical use | Main inputs |
|---|---|---|
| Minutes to about an hour (nowcasting) | Ramp warnings, intraday revisions | Live plant data, sky cameras, satellite cloud motion |
| A few hours ahead | Intraday schedule revisions | Satellite cloud motion, latest weather model runs, live plant data |
| Day ahead | Scheduling, trading, maintenance windows | Numerical weather prediction, plant history |
| Weeks to months | Budget, revenue planning | Climatology, long-term irradiance data |
Long-range "forecasts" are really expectations based on climate averages. They are useful for budgets, but nobody can tell you whether a given Tuesday in March will be cloudy.
How a forecast is built
There are two steps. First forecast the weather at the plant. Then turn that weather into energy for this particular plant.
Step 1: weather
Numerical weather prediction (NWP) models simulate the atmosphere on a grid and are run several times a day by national weather services and commercial providers. They forecast irradiance, cloud cover, temperature and wind. Their weak point for solar is clouds: a model may get the day right but put a cloud band a few hours or a few kilometres off.
Satellite nowcasting takes images from geostationary weather satellites, works out how clouds are moving, and projects them forward. It is better than NWP for the next hour or two, and fades after that.
Sky cameras at the plant watch clouds approaching. They help for minutes-ahead ramps at large plants, and add hardware to maintain.
Step 2: weather to energy
There are two broad approaches, and most good systems combine them.
- Physical model. Convert forecast irradiance to the plane of the modules, apply temperature losses, inverter efficiency, clipping and known shading, and multiply by capacity. It works from day one, needs only the plant's design data, and is easy to explain.
- Statistical or machine-learning model. Learn from the plant's history how forecast weather turned into actual energy. It picks up effects the design data misses, such as local shading, real inverter limits and the bias of a particular weather provider. It needs at least several months of clean history, ideally a year to see every season.
A common, robust approach is to run the physical model, then let a learned model correct its errors based on history. Blending forecasts from more than one weather provider also tends to reduce error.
Start with a baseline
Before judging any forecast, set up a simple one to beat.
- Persistence: the next interval will be like this one. Hard to beat for a few minutes ahead, poor for tomorrow.
- Day-ahead persistence: tomorrow will be like today. Easy to compute, often surprisingly hard to beat in long clear seasons.
- Clear-sky scaled: the clear-sky output for each interval, scaled by recent cloudiness.
If a forecast cannot beat these over a season, it is not adding value, whatever its methods.
How to measure forecast error
Compare each forecast interval with the energy actually produced. The standard measures are simple.
MAE = average of |forecast − actual|
RMSE = √(average of (forecast − actual)²)
nMAE = MAE ÷ plant capacity
MAE is the typical miss, in kW or kWh. RMSE punishes large misses more, which matters when large deviations are what cost money. Normalised MAE divides by capacity so plants of different sizes can be compared. Be careful: some people normalise by capacity, some by actual energy, and some count night hours, which makes error look smaller because night forecasts are always right. Say which you use.
Also track bias, the average of forecast minus actual. A forecast that is always 5% high has a fixable problem. Look at errors by season and by weather type too. A model that is excellent on clear days and poor on broken-cloud days may still look good on average.
One more rule: compare the forecast with what the plant could have produced, not just what it did produce. If the plant was curtailed or an inverter was down, the actual figure is low for reasons the weather forecast could not know. Exclude or adjust those intervals, or the forecast gets blamed for plant faults.
What a plant needs before forecasting
- Accurate plant metadata: coordinates, DC and AC capacity, module tilt and azimuth or tracker type, and inverter limits.
- Clean history: energy per interval at the export meter, with gaps marked as gaps, not zeros.
- Known losses: curtailment, outages and breakdowns logged with times, so they can be left out of training and scoring.
- A trusted irradiance sensor to separate weather error from plant error. If the sensor is drifting, everything built on it drifts too.
- A feedback loop: forecasts stored, compared with actuals automatically, and reviewed.
Using a forecast in daily operations
A forecast earns its keep when people act on it. Put tomorrow's expected output next to today's actual on the screen the control room already uses, not in a separate tool. Use the forecast to choose the day for a planned inverter shutdown or a transformer inspection: the cloudiest day of the week costs least. Use it with the rain forecast to decide whether a cleaning cycle can wait. And when a schedule has to be sent to the grid operator, keep a record of each version sent and the time it was sent, so later deviation reports can be checked against what was actually submitted.
Review errors weekly at first. Large misses usually have a plain reason: a weather front that arrived early, a block out of service that nobody told the forecast about, or curtailment. Each one found is a fix to the process, not just to the model.
Common mistakes
- Training on data that includes curtailment and outages, so the model learns the plant is worse than it is.
- Using the wrong time zone or an interval label at the wrong end (start versus end of the interval), which shifts the whole curve.
- Not updating capacity after an expansion or a block taken out of service.
- Judging a model on a few clear weeks.
- Quoting error without saying how it was normalised.
Where HKDataCrest fits
HKDataCrest Solar does not forecast today. What it does provide is the ground a forecast stands on: expected generation from measured sunlight for every interval, gaps kept as gaps, curtailment and outages logged with times, and a check that flags a drifting irradiance sensor. HKDataCrest builds forecasting as a project on top of that data, with the error tracking described above. See AI for solar and performance analytics.