Why shared plants are harder to report
A plant with one owner and one offtaker has one report. A plant shared by several consumers has as many reports as it has consumers, and every one of them must agree with the others and with the meter. That sounds like arithmetic. In practice it is where most disputes start.
Each consumer sees only their own bill and their own report. They cannot check the plant's total. So when a figure looks low, they ask the developer, the developer asks the O&M contractor, and someone opens three spreadsheets to work out what went wrong. Often nothing went wrong. The numbers were split at different stages, or rounded differently, or one consumer's report used the SCADA figure while another used the meter.
The fix is a reporting method that is the same for every consumer, every month, and can be explained in one paragraph.
The arrangements, in plain terms
The words vary by state and regulator. The reporting problem is the same across them.
Captive
A consumer owns a plant, fully or partly, and uses its power. In India, the conditions for a plant to count as captive are set in Rule 3 of the Electricity Rules, 2005. Among them, captive users must together hold at least 26% of the ownership and consume at least 51% of the plant's annual generation. Your legal team will know the current form of the rule for your case. For reporting, what matters is that consumption must be measured and shown clearly every year.
Group captive
Several consumers hold the plant together, often through a special-purpose company, and each is credited with a share of the energy. Shares are usually fixed in the agreement, for example 50, 30 and 20 percent. Each consumer's credit appears on their own electricity bill from the DISCOM.
Third-party open access
The plant belongs to a developer, who sells power to one or more consumers over the grid. The consumers do not own the plant. The commercial split may be by contracted quantity rather than by a fixed share, but the plant's output still has to be divided between them for billing.
Wheeling and banking
Power is carried over the transmission and distribution network to the consumer's premises (wheeling). Where the state allows banking, energy generated but not consumed in one period can be set against consumption in another, under the state's rules and charges. Banking affects the consumer's bill. It does not change what the plant produced, and the plant report should keep the two apart.
Start from one set of plant figures
The most common mistake is splitting too early. If daily figures are split by share and then summed per consumer, rounding and late corrections pile up differently in each consumer's sheet. By month end, the consumers' totals no longer add up to the plant.
Do it the other way round:
- Build the plant's figures for the month once: generation, export at the meter, expected generation, losses by cause, availability and performance ratio.
- Reconcile the plant's export against the joint meter reading (JMR) taken with the DISCOM. Note the difference, and which figure is the billing basis.
- Split the agreed billing figure by each consumer's share.
- Write each consumer's report from those split figures.
Every consumer's energy then adds back to the plant's figure exactly, because there is only one plant figure to begin with.
What scales by share, and what does not
This is the rule people get wrong most often. Energy and money scale with the share. Ratios do not.
| Figure | Scaled by share? | Why |
|---|---|---|
| Generation and export (kWh) | Yes | Each consumer is credited with their share of the energy. |
| JMR energy and the JMR difference in kWh | Yes | The billing energy is divided the same way. |
| Lost energy by cause (kWh) | Yes | A consumer lost their share of what the plant lost. |
| Money figures (value of energy, value of losses) | Yes | They follow the energy. |
| Performance ratio | No | It describes the plant, not the consumer. 78% of the plant is still 78%. |
| Plant and grid availability | No | Same reason. A share of availability means nothing. |
| JMR difference in % | No | A percentage of the plant figure stays the same at any share. |
| Plant name and capacity | Shown as the plant's | Consumers should know which plant they hold a share of, and its size. |
If a consumer's report shows a performance ratio of 23% because someone multiplied 78% by a 30% share, you will get a phone call. It happens more often than you would think when reports are built by copying formulas across sheets.
What each consumer should see
A good monthly report for one consumer of a shared plant answers four questions without needing the plant's full report.
- How much energy was I credited with this month, and on what basis (meter, JMR)?
- How did the plant perform against what the weather allowed, in plain ratios?
- Where was energy lost, and was it the plant's fault or the grid's?
- What will change next month, if anything?
It should not show the other consumers' names, shares or figures. Each consumer's report goes to their own list of recipients. In a group captive the consumers may know each other. In third-party open access they often do not, and should not learn it from your report.
JMR first, then split
The joint meter reading is the figure the DISCOM bills on. It is taken at the plant's export meter, usually monthly, with both sides present. Your SCADA or inverter totals will not match it exactly. Meter accuracy, the time the reading was taken, and losses between the inverters and the meter all play a part.
Show the comparison openly: your own meter or SCADA figure, the JMR figure, the difference in kWh and in percent, and the JMR reference. A small, steady difference is normal. A sudden jump is worth checking before the report goes out, because it can mean a meter fault, a wrong multiplying factor, or a reading taken on a different date.
Then split the JMR figure, not your own, by share, unless your agreement says otherwise. Consumers are billed on what the DISCOM recorded. Their report should agree with their bill.
Grid losses and curtailment
Consumers in a shared plant care about one question when output is low: whose fault was it? A plant that stood idle for four hours because the feeder tripped is not the same as a plant that stood idle because an inverter failed and nobody went to site.
Split the month's lost energy into causes before sharing it out: grid outage, grid limit (curtailment ordered by the SLDC or DISCOM), equipment down, soiling, and unexplained. Each consumer then sees their share of each cause. The developer and the O&M contractor see the plant total. The causes come from the plant's own records, logged with times, and do not change between consumers.
For curtailment in particular, keep the order details: who issued it, when, the reference, the megawatt cap and how long it lasted. A consumer who is told "the grid limited us" will reasonably ask for the evidence.
Shares change. Keep the history.
Shares are not always fixed for the life of the plant. A consumer may leave, a new one may join, or the agreement may be revised. When that happens, the old shares still apply to the months before the change.
- Record each share with the date it starts applying.
- Check the shares add up to 100% for every date.
- Never rewrite a past month's report with today's shares.
- When a past month is corrected for another reason, re-split it with the shares that applied then.
Common mistakes
- Splitting daily and summing monthly. Rounding drifts and the consumers no longer add up to the plant.
- Scaling ratios. Performance ratio and availability belong to the plant.
- Mixing sources. One consumer's report on SCADA, another's on the JMR.
- Sending one consumer's report to another. A shared mailing list for "all offtakers" is a data leak waiting to happen.
- Hiding the grid. If curtailment is not shown separately, the plant takes the blame for it.
- Mixing banking into generation. Banked energy is a billing matter. The plant report shows what the plant made.
Where HKDataCrest fits
HKDataCrest Solar handles plants shared by several consumers. Each consumer signs in to the customer portal and sees the plant by name and size, with every energy and money figure at their share, while performance ratio, availability and the JMR difference in percent stay the plant's own. Each consumer gets their own monthly report at their share, sent to their own recipients. See shared plants and reports and MIS for how it works.